Saturday, 23 November 2024

“Focus on system stability and energy efficiency”

Winning a bid to supply VRF systems to over 400 villa units, American Pro says that the recent feat boosts its campaign to establish good-brand recognition in the Middle East and to promote its digital scroll VRF system.

  • By Content Team |
  • Published: August 15, 2013
  • Share This Article

Winning a bid to supply VRF systems to over 400 villa units, American Pro says that the recent feat boosts its campaign to establish good-brand recognition in the Middle East and to promote its digital scroll VRF system.

“The government of Abu Dhabi developed plans to build nearly 2,000 units of villas, and allot them to native citizens. The project was divided into two phases, with American Pro winning the bid to supply air conditioning products for the first phase, comprising more than 400 villas. American Pro is now aggressively bidding for the second phase of the project.

“The central air conditioning system employs tropical-condition digital scroll VRF outdoor units, with wall-mounted and duct-type indoor units. A sample system was installed in one of the reference villas for a non-stop, long-term reliability test, and a special team of consultants and experts from the UAE was invited to inspect the laboratory testing.

“The tropical-application series of products have shown excellent performance, high efficiency and reliability, even at the highest ambient temperature (up to 54°C). In order to meet the technical requirements of the owners and consultants, the R&D engineers set up a technical team to customise the corresponding control function and cooling system.

“The United Arab Emirates, as one of the largest economies in the Middle East, plays a very important role in the region. Winning the government project helps American Pro in establishing good-brand recognition in the area, in promoting its digital scroll VRF product. Concentrating on system stability and energy efficiency, American Pro has strong communication with its consultants and design engineers during the project consulting, the designing and the bidding. This makes the actual project requirement clear, and allows them to provide the appropriate proposal.”

Related News

You May Also Read