CCME.NEWS

Your source for the HVACR Industry, covering in-depth news & analyses on policy, business & technology.

Get Premium:

Sign-up

COMMERCIAL ENQUIRIES:

Frédéric Paillé
Co-Founder & Commercial Director
fred@cpi-industry.com
+971 50 714 7204

Follow Us

CCME.NEWS

CCME.NEWS, covering the regional and global HVACR industry with an unwavering commitment to providing in-depth news and analyses on policy, business and technology

Contact Info

PO Box 13700,
Dubai Media City, Dubai
admin@cpi-industry.com
+971 50 714 7204

Follow Us

Bry-Air conducts technical workshop on adsorption chillers

Company to manufacture and sell Power Partners’ ECO-MAX brand adsorption chillers in UAE
Report by Climate Control Middle East Dubai, UAE: India-headquartered Bry-Air, in collaboration with US-based Power Partners Inc (PPI), conducted a technical workshop on adsorption chillers on March 6 at Le Meridien, Garhoud, Dubai. At the workshop, Ashok Kumar Prusty, Executive Vice President at Bry-Air, announced the signing of a licence agreement between the two entities for Bry-Air, to manufacture and sell PPI’s ECO-MAX brand adsorption chillers in the UAE. The agreement allows Bry-Air to expand its product portfolio to include closed-loop adsorption products. Also, under the agreement, PPI will share its knowledge of adsorption chiller design, manufacturing, applications and marketing with Bry-Air, and assist with product commercialisation. Speaking about their adsorption chiller technology, Wes Livingston, North America Business Leader at PPI, said that their adsorption chillers use energy from waste heat, with very low electricity consumption, to provide chilled water for process cooling and air conditioning. This, he said, was done with water as refrigerant and silica gel as desiccant. Elaborating on the advantages of adsorption chillers, he said, “The payback period for an adsorption chiller is 3.64 years in comparison to a water-cooled chiller, and 2.41 years against air-cooled chiller.” Livingston carried out a lifecycle cost (LCC) analysis for both adsorption and absorption chillers, and concluded that the operational cost for adsorption chillers is approximately USD 150,000, as opposed to an absorption chiller, which is USD 300,000.